Sunday, December 30, 2012

Cabinets and Floors!

Finished front door installed.  Still need the riser underneath.

Cabinets up awaiting countertops and some trim.

Pantry door and cabinets around refrigerator opening.


Looking forward to seeing the countertops installed.



Living room flooring installation.

Master bedroom trim.  Waiting for carpeting.


Boys' room trim.

Hallway bathroom vanity.


Master bath vanity.

Water heater next to pressure tank.




Railing installed, needs paint and stain.



Sunday, December 2, 2012

Color my world.

In the last month, we've ordered the cabinets and counters, bath vanities, purchased our appliances, and started painting...check out the color scheme so far.  (Random basement pic thrown in?)

The Laundry Room

Kitchen and Dining

Great Room

Hallway

Boys' Room

Basement Utility 

Sunday, November 4, 2012

Puttin' meat on the bones.

The exterior siding is up, driveway poured and lines cut, waiting for a deck.



The interior has drywall.
The Kitchen, sans kitchen stuff.

Little half bath off the mudroom.

Mudroom.

Looking into the family room from the kitchen.

Looking from the family room at Grant in the bedroom hallway.  The interior basement steps, foyer, front door.  

In Clare's room.

Kids' bathroom.

The tunnel o' love.

Looking in the master bath.

Tuesday, October 30, 2012

Working hard today!

Siding is nearly done on the front!

Fresh concrete driveway!

The molding over the front windows will be installed soon.

Saturday, October 27, 2012

Octoburrrrrrrrr!

Good thing we have some siding and some insulation!  It's getting cold out there!

Driveway and walkway forms are in.

The siding is complete on the right side and back.

Close up of the siding and end piece.

Front left corner siding.

Drywall is up in the garage. Lots of room!

Insulation is in.  And we got tagged!

Tuesday, October 23, 2012

Oh What A Month!

The house building is still happening even though we haven't been blogging as often.  Many small, but necessary items are being installed.
The Front.

We have a temporary front door. Our actual door is a craftsman style door.
pipes and vents

Can lights in the great room.

The electrical work is coming along.  Outlets, wires, and switches abound!

The basement steps to the garage.

The view out of our garage.  

Driveway forms.

Garage insulation


The patio door

Can lights in the kitchen

Washer/Dryer hookups

The fireplace is in.

Steps to the basement.

Bath in place.

Master bathroom - oh how excited we are for this!