Wednesday, September 19, 2012

Update

It's been a week since the last post. I'm adding some current photos so you can see the progress along with a little info.

Roof trusses are up.  Showing the gable end above the double garage opening.

Looking at the front porch

Overhang for the rear covered deck.

A view from the right rear

View from the right side

some fill is still needed on this side of the garage along with the back side

looking up through the trusses to the roof sheeting

Looking through the future fireplace and the rear covered deck to the back yard.