We got quite a bit of rain last night through the early morning. The weather did not prevent all progress on the house though. The floor deck and a bit of rough electrical were installed today.
Karen and I also called the power company to have service run to the house along with temporary service for the build.
Pictures!
 |
With the front porch in the foreground. |
 |
Grant standing towards the left rear of the house. |
 |
Stairwell from the garage. |
 |
Grant on the right side of the house. |
 |
View from the left rear at the floor deck level. |
 |
Where the power meter will be installed. |
 |
Floor deck. |
 |
Garage/house interface. |
 |
We caught up with the forklift operator...he didn't really want to be bothered while he worked. |